When with a previous employer, Paul was the Structural Lead for the design, documentation and construction phase of an 8 storey high-end development on Whistler Street, Manly. The design and construction was made complex by being constructed on saturated sand with a high water table located immediately below the basement slab level.
In addition, the site was located between two existing buildings, both of which were built out to boundary. One of these buildings was the heritage listed Manly Main Sub-Station and Switch house, which was supported on shallow spread footings at high level and risked being undermined by basement excavations. The solution adopted was to construct the basement by top down methods, installing a basement wall formed of cuttersoil mix (CSM), which was buttressed by temporary CSM walls installed perpendicular to the basement walls.
Constructing close to boundary required close attention to develop solutions for fire separating load-bearing walls, which were readily buildable, but also visually suitable for an external facade where the walls were exposed. Paul worked collaboratively with Hutchison Builders to assess different options to ensure that the solutions proposed were technically suitable and also of minimal building risk.
testimonial